• About
  • Advertise
  • Careers
  • Contact
Friday, June 12, 2026
  • Login
  • Register
No Result
View All Result
NEWSLETTER
  • News
    • Politics
    • Education
    • Health
    • Africa
    • World
  • INVESTIGATIONS
    • Special Reports
    • COLUMNISTS
  • Business
    • Agriculture
    • Technology
    • Finance
  • MULTIMEDIA
    • Radio
    • Television
    • Podcasts
  • FEATURES
    • Tourism
    • Entertainment
    • Society
  • SPORTS
  • E-Paper
  • News
    • Politics
    • Education
    • Health
    • Africa
    • World
  • INVESTIGATIONS
    • Special Reports
    • COLUMNISTS
  • Business
    • Agriculture
    • Technology
    • Finance
  • MULTIMEDIA
    • Radio
    • Television
    • Podcasts
  • FEATURES
    • Tourism
    • Entertainment
    • Society
  • SPORTS
  • E-Paper
No Result
View All Result
No Result
View All Result
Home News

NWSC Signs Contract to Expand Water Supply & Sanitation in Gulu City

by Homeland Digital
January 21, 2022
in News
0
NWSC Signs Contract to Expand Water Supply & Sanitation in Gulu City

The National Water and Sewerage Corporation [NWSC] Managing Director Eng.Dr.Silver Mugisha at the launching and award of contracts which will be supervised by Fichtner Water & Transportation GmbH - GOPA Infra GmbH in association with M&E Associates Ltd and Governance Systems International, Germany. The project works are expected to be completed by June 2024. COURTESY/PHOTO

0
SHARES
10
VIEWS
Share on FacebookShare on Twitter

By HOMELAND MEDIA NEWSROOM

The National Water and Sewerage Corporation (NWSC) has signed a Gulu water supply  and sanitation project phase 2 aimed at extending safe and clean water in Gulu City and surrounding areas.

Information obtained from the NWSC, the Managing Director of NWSC Managing Director Eng., Silver Mugisha and Jean-Luc Sion, the country Director of Sogea Satom-Uganda signed the execution contract of Gulu water supply and sanitation project phase 2 that will serve up to 500,000 people once complete.

The signing took place on at NWSC head office at Nakasero Kampala on Monday.The project is co-funded by the World Bank under the Water Management and Development Project (WMDP), KfW under the Integrated Program to Improve the Living Conditions in Gulu (IPILC 1) and the Government of Uganda.

The Gulu project has improved water supply and sewerage services in Gulu City and surrounding areas.

The phase 1 project entailed, the construction of a new intake at Oyitino 2, upgrading and expansion of the existing water treatment plant from a production capacity of 4,000m3/day to 10,000 m3/day, upgrading of the existing water supply and distribution network, upgrading and expansion of the existing wastewater treatment plant and wastewater collection system, and construction of a faecal sludge reception and treatment centre.

However, the measures implemented were only for the short-medium term i.e. up to 2025.

National Water and Sewerage Corporation [NWSC] is set to start execution of Gulu Water Supply and Sanitation Project Phase 2 (Gulu Phase 2) that will see many areas in Gulu city having clean and safe water.

Accordingly, the Gulu water supply  and sanitation project phase 2 will be executed under two works contracts and the Package 1 funded by KfW (under the Integrated Program to Improve the Living Conditions in Gulu and Small Towns En Route in the Victoria Nile Catchment Phase 2, IPILC 2) entails development of 10,000m3 per day water treatment plant at the River Nile at Karuma (including 30,000m3 per day water intake), construction of 5,000m3 reservoir in Gulu and branch off systems to supply six small towns from Karuma to Gulu.

Package 2 will be funded by the World Bank (under the Integrated Water Management and Development Project, IWMDP) entails construction of 70.5 kilometre transmission pipeline from Karuma to Gulu, and the selection of the contractor for Package 1 works (involving construction of a new intake along the River Nile at Karuma, construction of water treatment plant and pumping station.

Construction of new water storage in Gulu and water supply in the town’s en-route to Gulu from Karuma) has been completed, and contract awarded to M/s Sogea Satom, France.

The Homeland Media has learnt that, selection of contractor for Package 2 works (involving construction of Treated Water Transmission Pipeline from Karuma to Gulu) is expected to be awarded in February 2022, and contract signed in March 2022.

Both works contracts will be supervised by Fichtner Water & Transportation GmbH – GOPA Infra GmbH in association with M&E Associates Ltd and Governance Systems International, Germany. The project works are expected to be completed by June 2024.

Email:homelandnewspaper@gmail.com

Homeland Digital

Homeland Digital

Next Post
NWSC Calls for Environment Protection in Ankole Region

NWSC Calls for Environment Protection in Ankole Region

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Kenyatta Dumps Deputy Ruto Seals Deal with Opposition Bigwigs to Rally Behind Raila Odinga!

Kenyatta Dumps Deputy Ruto Seals Deal with Opposition Bigwigs to Rally Behind Raila Odinga!

5 years ago
EC insists “NO” mobilisation of voters to linger at polling stations!

EC insists “NO” mobilisation of voters to linger at polling stations!

6 months ago

Popular News

  • Lady Gaga Pulled Off One of the Best Halftime Shows Ever

    0 shares
    Share 0 Tweet 0
  • Watch Justin Timberlake’s ‘Cry Me a River’ Come to Life in Mesmerizing Dance

    0 shares
    Share 0 Tweet 0
  • New York Newest Vegan Spot: No Shade From Us, Shady Shack Is On Point

    0 shares
    Share 0 Tweet 0
  • Obama Wants To Visit Ubud On Low-key Bali Vacation: Bali Official

    0 shares
    Share 0 Tweet 0
  • The Chainsmokers Actually Make a Great Nickelback Cover Band

    0 shares
    Share 0 Tweet 0

Connect with us

Newsletter

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor.
SUBSCRIBE

About Us

We bring you the best Premium WordPress Themes that perfect for news, magazine, personal blog, etc. Check our landing page for details.

  • About
  • Advertise
  • Careers
  • Contact

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
    • Politics
    • Education
    • Health
    • Africa
    • World
  • INVESTIGATIONS
    • Special Reports
    • COLUMNISTS
  • Business
    • Agriculture
    • Technology
    • Finance
  • MULTIMEDIA
    • Radio
    • Television
    • Podcasts
  • FEATURES
    • Tourism
    • Entertainment
    • Society
  • SPORTS
  • E-Paper

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.