• Home
  • News
    • Politics
    • Education
    • Health
    • Africa
    • World
  • INVESTIGATIONS
    • Special Reports
    • COLUMNISTS
  • Business
    • Agriculture
    • Technology
    • Finance
  • MULTIMEDIA
    • Radio
    • Television
    • Podcasts
  • FEATURES
    • Tourism
    • Entertainment
    • Society
  • SPORTS
  • E-Paper
No Result
View All Result
Get Started
Writy.
  • Home
  • News
    • Politics
    • Education
    • Health
    • Africa
    • World
  • INVESTIGATIONS
    • Special Reports
    • COLUMNISTS
  • Business
    • Agriculture
    • Technology
    • Finance
  • MULTIMEDIA
    • Radio
    • Television
    • Podcasts
  • FEATURES
    • Tourism
    • Entertainment
    • Society
  • SPORTS
  • E-Paper
No Result
View All Result
No Result
View All Result

NWSC Intensifies Water Supply in Kalungu District over 7 Towns to Benefit!

Homeland Digital by Homeland Digital
March 12, 2022
in News
0
According to NWSC MD Dr Eng Silver Mugisha, the corporation will implement a two-phased intervention – short and long term – to improve water supply services in Kalungu. The decision for this way of resolving water supply challenges was reached during engagements between the utility and its stakeholders in the past couple of months.

According to NWSC MD Dr Eng Silver Mugisha, the corporation will implement a two-phased intervention – short and long term – to improve water supply services in Kalungu. The decision for this way of resolving water supply challenges was reached during engagements between the utility and its stakeholders in the past couple of months.

Share on FacebookShare on Twitter

By HOMELAND MEDIA NEWSROOM

KALUNGU: National Water and Sewerage Corporation (NWSC) has intensified efforts to improve water supply for residents of Kalungu District and surrounding areas.

According to NWSC MD Dr Eng Silver Mugisha, the corporation will implement a two-phased intervention – short and long term – to improve water supply services in Kalungu. The decision for this way of resolving water supply challenges was reached during engagements between the utility and its stakeholders in the past couple of months.

In the short term, NWSC is in the advanced stages of replacing the 3,150m length along Kasakango Valley, development of Bulingo boreholes, construction of Kalungu booster station and construction of 100m3 Lusango reservoir, drilling and development of the 20m3/hr as well as the 30m3/hr at Bulingo and, Construction of pump houses.

In the medium to long-term interventions, NWSC has completed detailed designs for a new Water Treatment Plant on River Katonga. According to MD Dr Eng Mugisha, upon completion, this project will see water production increase from the current capacity of about 200,000 litres per day to 4,000,000 litres per day. The new project will bring smiles on the faces of people residing in Kalungu Town council, Lusango, Kamuli, Kyamulibwa, Bugomola, Luvule, Lugasa, and Buyikuzi Mwota, among others.

THE BIDDERS INCLUDE ZHONGHAO OVERSEAS CONSTRUCTION & ENGINEERING CO LTD, HASO ENGINEERS, WEIHAI INTERNATIONAL ECONOMIC & TECHNICAL CO. LTD.COURTESY/PHOTO

“As part of the Project, the new Water Treatment Plant shall be constructed at Bugomola, with a raw water intake on River Katonga, and shall encompass the construction of a 1,500,000 million litre reservoir at Ssala Hill, and laying of over 40km of N250mm treated water pipelines, among others,” explained Mugisha.

The detailed designs for the project have been completed. Consequently, construction works tenders were advertised on January 28, 2022. A pre-bid meeting has also been held to allow prospective bidders to visit the project sites and familiarize themselves with the tender requirements as well as scope of work.

Talk to Waterman and report any Water Leak in your area. COURTESY/NWSC

During the pre-bid meeting at the Kalungu Area office, Project Manager Eng Denis Taremwa explained the contents of the tender documents. Eng Taremwa also briefed the bidders – who included Zhonghao Overseas Construction & Engineering Co Ltd, Haso Engineers, Weihai International Economic & Technical Co. Ltd – about the salient features in the documents, including the technical specifications, bills of quantities, engineering drawings, and the evaluation criteria that shall be followed.

“The Project, especially the intake works are complex and shall require an experienced Contractor. The Bidders’ methodology should elaborate on how this specific scope of works shall be executed,” added the project manager.

Brendah Ninsiima, the procurement officer, told bidders that the bids should be submitted on March 29, 2022. Ninsiima also revealed that the procurement process will be completed in April 2022. NWSC hopes to see the works contract signed by the end of May 2022. Construction works are expected to commence in June 2022, and will last 15 months.

Homeland Digital

Homeland Digital

Recommended

Revolutionizing Stock Trading: Real-Time AI-Driven Sentiment Analysis with Predictive Hedging

July 21, 2026
CLIMATE CHANGE: Shell Launches Campaign to Popularize Use of Clean Energy

CLIMATE CHANGE: Shell Launches Campaign to Popularize Use of Clean Energy

August 23, 2021

Popular Story

  • Tshaka Mayanja Biography: Age, Children,Family,Career, Education Background!

    Tshaka Mayanja Biography: Age, Children,Family,Career, Education Background!

    610 shares
    Share 244 Tweet 153
  • Here are 10 Businesses You Can Start With Capital Of Shs150,000

    602 shares
    Share 241 Tweet 151
  • Bobi Wine’s Children enjoying Life in exile

    602 shares
    Share 241 Tweet 151
  • Sir Edward Mutesa 11’s Legacy and His Love for Buganda Kingdom

    601 shares
    Share 240 Tweet 150
  • UACE 2025: Examiners flag application gap as performance dips in several subjects

    598 shares
    Share 239 Tweet 150

🏢 About Homeland Media (homelandmedia.co.ug)

Homeland Media Group Uganda is a Ugandan media company that operates The Homeland Newspaper and other digital news platforms focused on news reporting, analysis, and media services.

The platform mainly publishes online news content covering Uganda and international stories, including politics, business, security, education, and entertainment.

Copyright © 2026 Homeland Media Group. All rights reserved.

No Result
View All Result
  • Home
  • News
    • Politics
    • Education
    • Health
    • Africa
    • World
  • INVESTIGATIONS
    • Special Reports
    • COLUMNISTS
  • Business
    • Agriculture
    • Technology
    • Finance
  • MULTIMEDIA
    • Radio
    • Television
    • Podcasts
  • FEATURES
    • Tourism
    • Entertainment
    • Society
  • SPORTS
  • E-Paper

Copyright © 2026 Homeland Media Group. All rights reserved.