• About
  • Advertise
  • Careers
  • Contact
Friday, June 12, 2026
  • Login
  • Register
No Result
View All Result
NEWSLETTER
  • News
    • Politics
    • Education
    • Health
    • Africa
    • World
  • INVESTIGATIONS
    • Special Reports
    • COLUMNISTS
  • Business
    • Agriculture
    • Technology
    • Finance
  • MULTIMEDIA
    • Radio
    • Television
    • Podcasts
  • FEATURES
    • Tourism
    • Entertainment
    • Society
  • SPORTS
  • E-Paper
  • News
    • Politics
    • Education
    • Health
    • Africa
    • World
  • INVESTIGATIONS
    • Special Reports
    • COLUMNISTS
  • Business
    • Agriculture
    • Technology
    • Finance
  • MULTIMEDIA
    • Radio
    • Television
    • Podcasts
  • FEATURES
    • Tourism
    • Entertainment
    • Society
  • SPORTS
  • E-Paper
No Result
View All Result
No Result
View All Result
Home News

Lyantonde-Kiruhura Districts to Get New Water Supply System!

by Homeland Digital
July 12, 2022
in News
0
Lyantonde-Kiruhura Districts to Get New Water Supply System!

National Water MD Eng.Syliver Mugisha with Other Officials including Lyantonde- Kiruhura District Chairperson Inspecting ongoing construction of a Supply System through National Water and Sewerage Corporation has secured funding worth Ushs 15.1billion to implement a new water supply system across the districts of Lyantonde and Kiruhura by December 2022. NWSC/PHOTO

0
SHARES
7
VIEWS
Share on FacebookShare on Twitter

By Nasser Kasozi Akandwanaho

The Government of Uganda through National Water and Sewerage Corporation (NWSC) has secured funding worth Ushs 15.1billion to implement a new water supply system across the districts of Lyantonde and Kiruhura by December 2022.

The Water Supply Project is majorly aimed at ensuring the provision of good quality drinking water to the water stressed areas in the two districts which also includes the Industrial Park in Nshara and all surrounding communities respectively.

While inspecting the ongoing works, NWSC MD Dr. Eng. Silver Mugisha appreciated the Lyantonde and Kiruhura local leadership for their tremendous support towards this project’s implementation.

“We are currently serving Lyantonde and Kiruhura districts using one plant with 2.1million litres per day of water production capacity against a demand of 5million litres which is not enough. However, the new plant will produce 5million litres of water per day. The combined water production from the two plants upon completion will cater for any existent demand for water services to support industrialization and the water needs of the two sister districts until 2032 in the long run,” he added.

Works at the treatment plant site in Rukukuuru, the reservoir site and pipe laying at Nshaara are ongoing and are at an advanced stage. The Project shall be completed by end of December 2022. NWSC/PHOTO

Eng. Mugisha equally commended the contractor and NWSC project supervisors for successfully implementing this project within given time and cost.

Eng. Mugisha urged the people of Lyantonde and Kiruhura to protect the lake against pollution and engage in source protection initiatives to curb human activities near the lake.

Lyantonde and Kiruhura districts have previously faced water supply challenges due to increased demand for water services and extreme weather events during the prolonged dry spell hence increased challenges of poor quality raw water that consequently doubled NWSC’s water production cost.

A Contract was signed with M/S PLUMBASE (U) LTD AND ANHUI HOLDING GROUP COMPANY LTD JV to execute the project.
i) Project Scope
The project entails development of an off-shore water in-take and a water treatment plant of capacity 5,000,000million litres per day, on the shores of Lake Kakyeera at Rukukuru Landing Site.

Works at the treatment plant site in Rukukuuru, the reservoir site and pipe laying at Nshaara are ongoing and are at an advanced stage. The Project shall be completed by end of December 2022. NWSC/PHOTO

The treated water will be pumped to a 1,500, 000million litres/day storage reservoir within Nshaara Ranch; from where it will gravitate to the areas of Rukukuru, Nshaara, Rwempogo, Akageeti, the industrial park, Rushere and the surrounding areas for domestic, agricultural and industrial use.

Works at the treatment plant site in Rukukuuru, the reservoir site and pipe laying at Nshaara are ongoing and are at an advanced stage.

The Project shall be completed by end of December 2022.

Email:homelandnewspaper@gmail.com

Homeland Digital

Homeland Digital

Next Post
NWSC Dismisses Allegations on Salary Misgivings Management Speaks on Smear Campaign!

NWSC Dismisses Allegations on Salary Misgivings Management Speaks on Smear Campaign!

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

NRM Panic as Muntu invites Tamale Mirundi at Launch of New formation Party

NRM Panic as Muntu invites Tamale Mirundi at Launch of New formation Party

7 years ago
dfcu Bank Suffers another Blow in London Court as Crane Bank row rages on.!

dfcu Bank Suffers another Blow in London Court as Crane Bank row rages on.!

11 months ago

Popular News

  • Lady Gaga Pulled Off One of the Best Halftime Shows Ever

    0 shares
    Share 0 Tweet 0
  • Watch Justin Timberlake’s ‘Cry Me a River’ Come to Life in Mesmerizing Dance

    0 shares
    Share 0 Tweet 0
  • New York Newest Vegan Spot: No Shade From Us, Shady Shack Is On Point

    0 shares
    Share 0 Tweet 0
  • Obama Wants To Visit Ubud On Low-key Bali Vacation: Bali Official

    0 shares
    Share 0 Tweet 0
  • The Chainsmokers Actually Make a Great Nickelback Cover Band

    0 shares
    Share 0 Tweet 0

Connect with us

Newsletter

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor.
SUBSCRIBE

About Us

We bring you the best Premium WordPress Themes that perfect for news, magazine, personal blog, etc. Check our landing page for details.

  • About
  • Advertise
  • Careers
  • Contact

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
    • Politics
    • Education
    • Health
    • Africa
    • World
  • INVESTIGATIONS
    • Special Reports
    • COLUMNISTS
  • Business
    • Agriculture
    • Technology
    • Finance
  • MULTIMEDIA
    • Radio
    • Television
    • Podcasts
  • FEATURES
    • Tourism
    • Entertainment
    • Society
  • SPORTS
  • E-Paper

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.